Oct 28, 2011

Log 12

AR
Log Date: October 28, 2011
Marking Period 1
Green Pier

10/28/11:

Work Started:
- editing rationale based on redesigned alternate solutions
- planning for model

Work Completed:
- alternate solutions (revised based off program)
- CAD drawing complete and uploaded to blog

Reminders:
- review documents sent by mentor
- FPU next Tuesday
- outline due Monday 10/31
- update mentor contacts

Oct 26, 2011

Log 11

AR
Log Date: October 26, 2011
Marking Period 1
Green Pier

10/26/11:

Work Started:
- organizing mentor contacts into a folder on e-mail
- editing of alternate solutions

Work Completed:
- surveyed land for civil engineering portion of project yesterday afternoon during classtime
- exterior of chapel on CAD drawing

Reminders:
- call mentor about attached documents
- talk to mentor about electrical work within chapel

Oct 21, 2011

Log 10

AR
Log Date: October 21, 2011
Marking Period 1
Green Pier

10/21/11:

Work Started:
- Editing CAD drawing still, different program is running much better and is more cooperative
- Materials list
- Began materials list for exterior for model

Work Completed:
- Reworking of chapel layout
- Model beginnings

Reminders:
- Continue CAD drawing
- Update mentor contacts

Oct 19, 2011

Log 9

AR
Log Date: October 19, 2011
Marking Period 1
Green Pier

10/19/11:

Work Started:
- Editing of graded sections and making necessary adjustments
- Redesigning of the chapel layout
- Reworking of CAD drawing using AutoCAD Architecture porgram

Work Completed:
- Went to green architecture program at Roselle Park High School

Reminders:
- Inform group of changes to the chapel and the direction the final product will face
- Rework plans using all green materials
- New scenario: building destroyed in a storm and being rebuilt up from the ground

Oct 14, 2011

Log 8

AR
Log Date: October 14, 2011
Marking Period 1
Green Pier

10/14/11:

Work Started:
- CAD drawing almost complete
- Mentor contacts sheet

Work Completed:
- Made necessary adjustments to parts of the blog

Reminders:
- Update logs
- Update mentor contacts frequently
- Presentation is October 19

Oct 12, 2011

Log 7

AR
Log Date: October 11, 2011
Marking Period 1
Green Pier

10/11/11:

Work Started:
- CAD drawing continuation
- Sent e-mail to mentors about materials
- Updated rationale

Work Completed:
- Mentor updates

Reminders:
- Update logs
- Update mentor contacts
-October 19 is the presentation!

Oct 7, 2011

Log 6

AR
Log Date: October 7, 2011
Marking Period 1
Green Pier

10/7/2011:

Work Started:
- CAD drawing continuation
- Edited rationale
- Messaged mentor

Work Completed: (from 10/5 to 10/7)
- Additional research

Reminders:
- Finish CAD drawing ASAP

Oct 5, 2011

Log 5

AR
Log Date: October 5, 2011
Marking Period 1
Green Pier

10/5/2011:

Work Started:
- Finshed Background information
- Edited font on background information, still not cooperating
- worked on CAD drawing
- Edited rationale

Work Completed: (between 9/30 and 10/5)
- Background information completed
- Continued research on green materials

Reminders:
- Keep up to date with mentors
- Stay on top of work
- Make any minor adjustments as needed

Sep 30, 2011

Log 4

AR
Log Date: September 30, 2011
Marking Period 1
Green Pier

9/30/2011:

Work Started:
- Continued to edit background information
- Located a website that provides green materials for the construction of a building (http://www.greendepot.com/greendepot/default.asp?&s_id=0)
- Editing rationale report

Work Completed: (between 9/29 and 9/30)
- Background informtaion almost finished
- Reserach on different green materials

Reminders:
- Finish editing background information
- Keep in contact with mentors, ask about a possible day for Mrs. Reed to come to the Hook
- Update logs constantly

Sep 28, 2011

Log 3

AR
Log Date: September 28, 2011
Marking Period 1
Green Pier

9/28/2011:

Work Started:
- Edited background information
- Developmental work
- Started CAD drawing

Work Completed: (between 9/24 and 9/28)
- Background information
- Rationale report (still needs to be edited)\

Reminders:
- Finish editing rationale
- Respond to mentors
- Constantly update logs and contacts

Sep 23, 2011

Log 2

AR
Log Date: September 23, 2011
Marking Period 1
Green Pier

9/23/2011:

Work Started:
- Extra research on the actual design of the chapel and the structure of it
- Contacting my mentor with more specific questions relating to sustainable materials

Work Completed: (between 9/20 and 9/23)
- Rationale is done, minor revisions will be completed as necessary
- More research on alternate materials
- Logs are up to date

Reminders:
- Give mentor a response to questions asked in e-mail
- Keep logs updated and concise

Sep 20, 2011

Log 1

AR
Log Date: September 20, 2011
Marking Period 1
Green Pier

9/20/2011:

Work Started:
- Began brainstorming ideas for Rationale due on Friday
- Actual design plan for the reconstruction of the chapel
- Continuing research on sustainable materials


Work Completed (as of 9/20):
- Design brief
- Specifications
- Limitations
- Background information on Architecture
- Alternate solutions (list needs to be typed up)

Reminders:
- Keep in contact with mentor(s)
- Call architect after school and talk about project and discuss a possible date to come and visit site