Jan 24, 2012

Preliminary Testing

Preliminary Testing:
- make sure specs and limits are followed
- finalize proposed design
- check with a specialist
- make sure all materials are sustainable
- check with mentors and teachers after every major step taken

After finalizing the list of materials used, some of the preliminary testing procedures have been completed.  All the materials used are all sustainable and will prove to be beneficial to the environment and were all also suggested and approved by my mentor who specializes in green and sustainable materials.  Both of my mentors like the current approach I'm taking on the project and are helping me with the actual layout of the building.  Because they are both specialists in their fields, it has been tested.  

No comments:

Post a Comment